Your old driveway is cracking, sinking, or draining toward your house. We build reinforced concrete driveways with proper base prep so the slab stays flat and intact through Marin's wet winters.

Concrete driveway building in Corte Madera means removing the old surface, preparing the ground underneath, and pouring a reinforced slab - most residential jobs take two to four days of active work, plus roughly a week of curing before you can drive on it.
Most homeowners reach out after noticing cracks that come back every spring, or sections of the driveway that have started to sink unevenly. In Corte Madera, those problems almost always trace back to the clay-heavy soil underneath shifting through the wet-dry cycle - which is why proper ground preparation matters more here than in many other parts of the Bay Area. If you are also dealing with a deteriorating walkway out front, our concrete sidewalk building service covers that work in the same project.
Every job starts with a free on-site estimate. We look at the existing surface, check site access for equipment and the concrete truck, and give you a written quote before anything is scheduled.
If you have noticed cracks that look a little bigger each spring, the slab is moving. In Corte Madera, this is typically caused by the clay soil expanding with winter rain and shrinking in the dry season. Hairline cracks can sometimes be sealed, but cracks wider than a quarter inch - or cracks with a lip where one side sits higher than the other - usually mean the slab needs to be replaced.
If part of your driveway sits noticeably lower or higher than the section next to it, the ground underneath has moved. This creates a trip hazard and allows water to pool in low spots, which speeds up further damage. In older Corte Madera neighborhoods near the bay, uneven settling is especially common in driveways built on fill soil.
Spalling - where the top layer chips or flakes away - means the concrete has reached the end of its useful life. You might notice loose grit on the surface after a dry spell, or small pockmarks that were not there a few years ago. Once spalling begins it spreads, and patching is only a short-term fix.
If rainwater pools on your driveway or runs toward the house rather than away from it, the slope is wrong. This happens when a driveway settles unevenly over time. In Corte Madera's wet winters, water sitting against a garage door or foundation creates real damage - mold, rot, and moisture problems. A new driveway can be graded to direct water away from the start.
Every driveway project starts with demolition of the old surface and proper subgrade preparation. We compact the soil, set a gravel base layer, and place rebar before any concrete is poured. These are the steps that determine whether your driveway lasts 30 years or 5. We do not skip them to lower a quote price.
For homeowners who want more than plain gray concrete, we offer broom-finished and decorative pours. A broom finish adds slip resistance - practical for a surface that gets wet in winter - and costs only a small amount more. For commercial or multi-vehicle properties, concrete parking lot building covers larger paved areas where durability under heavy traffic is the priority.
We handle the permit application through the Town of Corte Madera as a standard part of every job. You should not have to figure out the permit process yourself, and unpermitted driveway work can create real problems when you go to sell your home.
Best for homeowners who want a clean, durable surface at a straightforward price with built-in slip resistance.
Best for homeowners who want a finish that adds character to the front of the property without the cost of stamped concrete.
Best for homeowners updating a single-car driveway built in the 1950s or 1960s to accommodate two vehicles comfortably.
Best for homeowners whose current driveway sends water toward the garage or foundation and need the slope rebuilt correctly.
The biggest factor that sets Corte Madera driveway work apart is the soil. Much of the town sits on bay mud and clay-heavy ground that swells when wet and shrinks in the dry season. That movement is the reason so many driveways in this area crack within a few years of being poured. A contractor who rushes the base preparation step - or skips it to come in lower on the quote - is setting the slab up to fail before the first dry summer arrives. We do this work every day and build the base to handle Marin's soil conditions.
Permit requirements are another reality here. The Town of Corte Madera requires a building permit for driveway work that involves the curb cut or the public right-of-way. We handle the application as a standard part of every project, so you are not left figuring out paperwork on your own. Permitted work is inspected by the town - which gives you a documented record that matters at resale. We also serve homeowners throughout the area, including Mill Valley, Larkspur, and San Rafael.
Much of Corte Madera's housing stock was built in the 1950s and 1960s, which means many driveways were designed for single-car access on narrow lots. If you are updating one of these older driveways, we understand the access limitations, the tree root issues that are common on these properties, and the HOA review process that applies in some neighborhoods near the waterfront.
We come to your property, measure the area, check soil and access conditions, and give you a written quote that covers demolition, base prep, the pour, and cleanup. We respond within 1 business day.
Once you accept the quote, we apply for any required permits through the Town of Corte Madera. Permit review typically takes one to two weeks. We handle the paperwork and keep you updated on the timeline.
The crew removes the old driveway, grades and compacts the soil, and sets a gravel base layer. This step is the foundation of everything - it determines how long the finished slab holds up in Corte Madera's clay soil conditions.
The concrete truck arrives, the crew pours and finishes the slab, and control joints are cut before the surface sets. The driveway then cures for roughly seven days - you will get a specific date when vehicle access is safe.
We come to your property, look at the site conditions, and give you a quote that covers every step - no hidden costs, no surprises on the final invoice.
(628) 212-4120We excavate to proper depth and compact a stable gravel base before every pour. This is the step that prevents the cracking and sinking that ends most Corte Madera driveways within a decade - and it is the step that distinguishes a long-lasting job from a cheap one.
We apply for and manage the permit through the Town of Corte Madera on your behalf. When the job is done, you have a documented inspection record - which protects you when you go to sell the home. The California Contractors State License Board lets you verify any contractor's license before you hire.
Every driveway we build is graded to direct water away from the garage and foundation. This matters more in Corte Madera than in drier climates - Marin's wet winters mean a slope that is off by even a small amount sends water toward your house every time it rains.
Our quotes spell out demolition, base prep, the pour, finishing, and cleanup. We have completed driveway work for homeowners throughout Corte Madera and Marin County, and our return customers come back because the final invoice matches the quote they accepted.
Between the local soil conditions, the permit process, and the tight lots on older properties, concrete driveway work in Corte Madera has more variables than a standard suburban pour. We have worked through all of them and we understand what it takes to deliver a finished surface that holds up for decades in this specific environment.
For technical standards on concrete flatwork, see the Portland Cement Association driveway guide and the American Society of Concrete Contractors.
Replace a cracked or uneven sidewalk that connects to your driveway - same base prep standards, same permit process.
Learn moreLarger paved surfaces for multi-vehicle or commercial properties, designed for heavy traffic and long service life.
Learn moreMost contractors book out weeks in advance once the dry season starts. Call today or send us a message and we will get you a written estimate within 1 business day.